Ministry of Power

APPLICATION UNDER REGULATION 4.1, 4.2, 5.6, 5.7, and 5.11 FOR CONNECTIVITY TO ISTS

About this approval

This approval is required by all the entities (refer Approval applicability/trigger section below for details) who wants to obtain “Connectivity” to the Inter-State Transmission System in India or for enhancement of quantum of Connectivity already granted and is mandated as per the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State transmission System) Regulations, 2022.

“Application for connectivity to ISTS under Regulations 4.1, 4.2, 5.6, and 5.7” is the applicable form for this approval. The nodal agency for this approval is the Central Transmission Utility (CTU).