APPLICATION UNDER REGULATION 5.2 FOR ADDITION OF GENERATION CAPACITY INCLUDING ESS WITHIN THE QUANTUM OF CONNECTIVITY GRANTED
About this approval
This approval is required by all the entities (refer Approval applicability/trigger section below for details) who wants to add generation capacity including ESS within the quantum of Connectivity already granted to the Inter-State Transmission System and is mandated as per the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State transmission System) Regulations, 2022.
“Application for addition of generation capacity including ESS within the quantum of connectivity granted under Regulation 5.2” is the applicable form for this approval. The nodal agency for this approval is the Central Transmission Utility (CTU).